Summer has come, and many owners are decorating or preparing to decorate. Shanghai's summer is affected by the plum rains, which are rainy, humid, muggy and lack of air circulation, which are really detrimental to indoor decoration. However, if some effective technical measures can be taken, the construction quality can not be affected

summer has come, and many owners are decorating or preparing to decorate. Shanghai's summer is affected by the plum rains, which are rainy, humid, muggy and lack of air circulation, which are really detrimental to indoor decoration. However, if some effective technical measures can be taken, the construction quality can not be affected

weishibang

problem 1: the first quality problem of wall surface

huangmeitian decoration is that the wall surface is easy to be colored and shelled. For this, the following countermeasures can be taken: if new walls are required, enter the site for construction in advance, give sufficient drying time to the new wall surface, and seal the base course; The wall should also be inlaid in advance, and the purpose is to make it fully dry. Before the previous layer of inlay is completely dry, it must not be approved for the second time; Suitable batch embedding materials shall be selected, and gypsum board joints shall be batch embedded with materials of the same quality; Adopt appropriate artificial methods to accelerate drying; The wall paint should be properly selected, and milk yellow and dark wall paint should be used as little as possible

problem 2: floor

Huangmei Tianpu floor is easy to warp in the future if you don't pay attention to it, so the cement floor laying the floor should be kept dry, and effective partition treatment methods should be adopted at the dry and wet junction. When laying the floor, a moisture-proof film should be used to isolate the moisture. After the floor is laid, air holes should be left in the concealed places if conditions permit. The laying process should be determined according to the floor species, moisture content and air humidity. The trees with poor stability need to be unpacked and balanced for up to 72 hours

problem 3: wooden doors and door jambs

in order to make the wooden door jambs and doors installed by huangmeitian not deform, it is necessary to dry the wood and control the moisture content of the wood. The wooden door shall be completely sealed when leaving the factory, and shall be sealed after being unpacked on site. The decorative panel should be sealed for protection or pasted after Huangmei day

problem 4: ceiling

to prevent ceiling cracking, it is necessary to select high-quality gypsum board and try not to transport in rainy days. During the transportation, the gypsum board shall be packed completely to control the moisture content. The gap of gypsum board shall not be less than 0.5-0.8 mm, and it shall be embedded with materials of the same quality. The joint between the ceiling keel and the gypsum board shall be staggered